Heating Studs on Stop Valves, Control Valves, Throttle Valves,
BFP's and RCP's
|
|
|
Boiler Feed Pump Application |
|
Boiler Feed Pump
|
- Remove BFP head in 1/2 shift with two men
- Loosen each nut in 2-8 minutes
- Heats two to four studs simultaneously
- Compact model is hand carried to job
|
|
Reactor Coolant Pump
|
- Loosen RCP flange in one to two hours
- Reduce ALARA by 75%
- Use standard bolting from OEM
- Eliminate design change modifications
- Heats two to four studs simultaneously
|
|
|
Turbine Control/Stop and Throttle Valves
- Remove valve bonnets in one hour
- Loosen each nut in 2-8 minutes
- Heats two to four studs simultaneously
|
|
Speed Heating Benefits: |
- Speed Heating Benefits
- Loosens any diameter bolting in minutes
- Compact model is hand carried or rolled to job
- No cooling water necessary
|
- Costs less than an hydraulic torque wrench
- Training in less than 1 hour
- Eliminate outside contractors
- Heats two to four studs simultaneously
|
|
|